Pre-Construction

Scheduling

Here at ACE, our Pre-Construction team proudly offers clients scheduling services! We have been providing clients with the highest quality for decades. We are expert users in both Microsoft Project and Primavera P6. We pride ourselves on our expert ability to develop conceptual project proposals for proposal development, maintain detailed project schedules, and provide clients with schedule review and optimization. Check out the list below to see how ACE can assist you!

  • Expert User in Microsoft Project 2003/2007/2010/2013 and Primavera P6 software

  • Develop conceptual project schedules for proposal development

  • Develop and maintain detailed project schedules (Control & Maintenance)

  • Develop and maintain cost loaded and resource loaded schedules

  • Develop and maintain project forecasts and Schedule of Values

  • Conduct progress meetings updates with key stakeholders

  • Perform critical path analysis to identify key construction activities/risks

  • Create and model dynamic schedules for “What If" scenarios”

  • Schedule and earned value analysis using SPI & CPI

  • Bid Preparation using Project Schedule

  • Claims discovery & analysis for litigation, mediation and arbitration

  • QCS SDEF Imports and QCS billing utilizing a cost loaded schedule

  • Schedule Update (On and Off Site Meetings)

  • Critical Path Method (CPM) Scheduling

  • Preliminary & Initial Schedules

  • Schedules using Primavera Software 

  • Schedules using Microsoft Project Software

  • Cost Loaded Schedules

  • Cost Forecasting and Monthly Billing

  • Primavera Risk Analysis and Strategy Development

  • Project Controls Systems

  • Daily Production Analysis

  • S-Curve Analysis (SPI & CPI Calculations)

Integrated Master Schedules

  • Claims Discovery and Expert Witness

  • Forensic Scheduling Analysis

  • Expert Analysis and Advice

  • Training in Microsoft Project and Primavera

  • Uploads into QCS/RMS – SDEF Upload

  • Claims Analysis

  • Planned and As-Built Analysis Schedules

  • Time Impact Analysis

  • Normalized Schedule Analysis

  • Fragnet Development & Analysis

  • Proposal Schedules

  • P6 EPPM license leasing – ACE leases license. Contact us for Pricing

  • An Integrated Master Schedule consists of a program schedule that includes the entire required scope of effort to complete your project; from as early as feasibility studies to as late as hiring and onboarding personnel.

  • An IMS includes many more workstreams than a traditional Critical Path Method Schedule.

  • An IMS has activities that generally roll up to high-level milestones that can be shared with Project Executives.

  • An IMS can span multiple years, include several parties, and track multiple work streams.

  • An IMS can assist with organizing a large project team under one umbrella with one accountability stream.

Scheduling Reviews

 In addition to ACE's multitude of scheduling services, we can also provide scheduling reviews. Our schedule review service includes providing clients with schedule optimization. First, the ACE team will review your current schedule. After doing so, ACE will provide you with a score on effectiveness, cleanliness, and efficiency. 

ACE has worked with a multitude of clients including, USACE, NAVFAC, VA, and others. With that said, we know what they're looking for. We can review your schedule based off:

  • Clarity 

  • Correctness

  • Logic

  • Critical Path 

  • Specification Requirements

After providing clients with an audit of their scheduling process, ACE can walk you through what steps you need to take to ensure you have an optimized schedule. Additionally, ACE can also take the burden off of you altogether by providing you with scheduling services.